GASCO entered into a contract with Brilliant Sanitary Ware factory in Mkuranga for undertaking Engineering, Procurement and Construction (EPC) for gas pipeline interconnection to the factory. The project commenced on 18th March,2026 with a contract period of six months.

The project includes construction of 250mm HDPE pipeline at a distance of 1.2Km and installations of Pressure Reduction Station (PRS), testing and commissioning of the installed gas network. The project was successfully completed on 28th August,2026.

;