Engineering Design and Construction Supervision for a gas pipeline connection to 20MW-TM43 TANESCO Power Plant in Mtwara

Engineering Design and Construction Supervision for a gas pipeline connection to 20MW-TM43 TANESCO Power Plant in Mtwara

On 25th September,2025 GASCO entered into an agreement with TANESCO for undertaking Engineering Design and Construction supervision works for gas pipeline and Filtering and Metering station connection. The project involves the construction of 6’’ schedule 80 gas pipeline ata distance of 0.13Km and installation of FMS. GASCO was a main Consultant of the Project and the Contractor for the project was M/s Power Associate (PAL). The project was successful completed on 9th October,2026 and power plant is now operating smoothly.

This is one among the project, GASCO Consult Company Limited. has undertaken since has been registered as a Consulting firm.